structural engineers
GR EN
where I am: Home page > Projects > Special structures - Industrial > Modification of floating sliding formwork for the fabrication of caisson
Modification of floating sliding formwork for the fabrication of caisson

PROJECT:  Modification of floating sliding formwork for the fabrication of caisson

CLIENT:  “Joint venture for Patras port” j/v TERNA SA – AKTOR SA.
ASSOCIATED OFFICES:                                         

BRIEF DESCRIPTION:
 
Modification design and construction drawings for the floating sliding formwork for the fabrication of caisson, including all auxiliary equipment (floors , inspection track, etc ). This design based on the existing, incomplete initial construction drawings and from on-site measurements.
For more details.
 
The project has been completed successfully in terms of modifications of the floating sliding formwork.
 
Design years: 2013
Design standards: EN1993-1

     See
     Also..