structural engineers
GR EN
where I am: Home page > Projects > Special structures - Industrial > Danube oil terminal at Giurgiulesti Moldova
Danube oil terminal at Giurgiulesti Moldova

PROJECT:  Danube oil terminal at Giurgiulesti Moldova

CLIENT: Triton Consulting Engineers Ltd.
ASSOCIATED OFFICES: Triton Consulting Engineers Ltd                                         

BRIEF DESCRIPTION:
 
The terminal was constructed in Moldova area of the river Danube. The facility can accept tankers up to 10.000 DWTs and considered the largest of its kind along the Danube River.
Design of the structural part of the steel platform access bridge access.
  • The platform has dimensions in plan 24.3x14.0m and it is a grid of truss girders formed by hollow sections
  • The bridge has a span of 38.5m,is a spatial lattice by hollow sections and caries oil pipes and personnel.
 
The project has been completed and is in operation.
 
Design years: 1995-2000
Design standards: DIN

     See
     Also..