structural engineers
GR EN
where I am: Home page > Projects > Structural parts in ports > New port of Santorini
New port of Santorini

PROJECT:  New port of Santorini island to accommodate ships in location Vlychada

CLIENT: ADK Consulting Engineers SA.
ASSOCIATED OFFICES:                                         

BRIEF DESCRIPTION:
 
Design of the structural part of the reinforced concrete superstructure with all auxiliary structures (pre-slabs, manholes, etc.) and the reinforced concrete cellular boxes (Caissons) for the infrastructure of the port.
  • Designed one typical superstructure that serves as breakwater (with the use of a wall) and pier to accommodate passenger ships.
  • Designed one typical  cellular box (Caisson) with dimensions in plan and height 21x13x10.9m and is divided into 2 rows of cells with 5 cells on each row.
 
The project has not been built yet.
 
Design years: 2005
Design standards: Greek Standard of Structural Concrete (EKOS), Greek Earthquake Design Standard (EAK)

     See
     Also..