structural engineers
GR EN
where I am: Home page > Projects > Design verifications > Design verifications for the E65 Independent Engineer
Design verifications for the E65 Independent Engineer

PROJECT:  Design verifications for the Independent Engineer E65

CLIENT: J/V «SCOTT WILSON LTD - OMEK SA Motorway CENTRAL GREECE E65»

BRIEF DESCRIPTION:
 
Design verification of a significant number of final designs of bridges on the motorway E65. Indicative projects:
  • Final design of interchange bridges of TE3 (Lamia Junction) total length of 365m. Prestressed concrete, on piles
  • Final design of 2 bridges with total length of 90 and 110m respectively in Lamia Junction in branch AB2. Prestressed concrete, on piles.
  • Final design viaduct at Ch 24+700, total length 2x70m. Prestressed concrete, on piles.
  • Final design viaduct at Ch 25+365, total length 2x140m. Prestressed concrete, on piles.
  • Final design of 2 bridges at Ch 39+419 Motorway and service road each 30m long. Prestressed concrete, on piles.
  • Final design of the bridge at Ch 55+315, total length 2x148m.  Prestressed concrete, on piles.
  • Final design bridges G007 and G008 at Ch 72+697 and Ch 75+910, total length of 71m. Portal frame, prestressed concrete, on piles.
  • Final design of the bridge G29A at Ch 105+982, total length of 71m Portal frame, prestressed concrete, on piles.. Final design of the bridge G036 at Ch 112+728, total length of 85m Portal frame, prestressed concrete, on piles.
  • Final design of the bridge G043 at Ch 122+998, total length of 68m Portal frame, prestressed concrete, on piles.
  • Final design of the bridge OP 43 at Ch 131+475, total length of 110m Portal frame, prestressed concrete.
  • Final design of the bridge OP 43b at Ch 132+4215, total length of 79m Portal frame, prestressed concrete.
  • Final design of the bridge at Ch 143+900, total length 2x57m.  Prestressed concrete, on piles.
  • Final design of the bridge at Ch 144+350, total length 2x80m.  Prestressed concrete, on piles.
  • Final design of the bridge at Ch 161+474, total length 2x320m.  Prestressed concrete, on shafts.
  • Final designs of motorway under crossings.
  • Final designs of pile retaining walls.
  • Final designs of culverts.

The project is in progress

Design years: 2010-
Design standards: DIN, Greek Earthquake Design Standard (EAK)

     See
     Also..